Right click menu options

clipboard_e9fad06324f8cdcca6b0fa49b8d935fe5.png

Apart from the Job Filter,  the right-click menu provides you with the following options:

  • Include Completed Jobs: By default closed jobs are not displayed in the table. Selecting the Include Closed Jobs option on the right click pop up menu will allow you to view closed jobs on the homepage control. Note that when the End milestone of a job is marked as complete, the job is considered closed, and is not displayed along with open jobs.
  • Create Timesheet: Clicking this option opens the Timesheet Calendar Entry window where you can enter your time.
  • Create Bill: Opens the Billing Wizard Stage One window.
  • Show Field Chooser
  • Export to Excel: Exports the data in the table to an MS Excel spreadsheet.  Important: If you want to export the deadline dates to MS Excel, ensure that the homepage control displays the due dates, not the icons. To do this, right click on the homepage control and clear the Use Icons option if it appears selected.

There are also Milestone options available for a job. Note that these options are available only if the selected job has milestones attached to it. You can choose from the following status options

  • In progress
  • Complete
  • Risk
  • Problem

clipboard_e2061c84dc4ff932ba66a832614b6c7e2.png

The pop up menu also has an option to clear the status. Click Clear Status to remove the status.

To view the status as an icon, select the Use Icons option on the menu. The status in the grid will be displayed using icons.

If the Use Icons option is not selected, the status will be displayed in different colours along with the due date in date format for incomplete milestones.

To add comments to the milestone, select Insert Comment on the right click pop up menu. If a milestone has any comments attached to it, this will be indicated by a red triangle in the top right corner of the cell.

To edit or delete an existing comment on a milestone, right click the milestone. The menu will offer two options instead of the Insert Comment option: Edit Comment and Delete Comment.

To view details for a milestone, place the cursor over the milestone. The details will be displayed in a pop up.

Related documents

CCH Practice Management 2026.2: Release Notes
Release Notes for CCH Practice Management 2026.2
CCH Practice Management 2026.3: Release Notes
Release Notes for CCH Practice Management 2026.3
CCH Practice Management: enhanced - billing training online (10133815)
This document outlines a 3-hour training course on CCH Practice Management, focusing on the chargeable work process for clients. Participants will learn how to authorize timesheets, expenses, and disbursements, access prebilling reports, and utilize basic billing functionalities. The course is aimed at users involved in the billing process and requires prior completion of CCH Central and CCH Practice Management essentials courses. It will be delivered via an interactive environment called CloudShare. Additional resources such as eLearning courses, videos, and webinars are provided for further learning.
CCH Practice Management: essentials training online (10133814)
This course is designed for staff involved in completing Timesheets, Expenses, and Disbursements within the CCH Practice Management system. It covers the creation and submission processes, as well as utilizing CCH homepages for efficiency. Prerequisites include completed CCH implementations and internal agreement. The training lasts for two hours and is conducted via the interactive CloudShare platform. Topics include job structure, month-end processes, and practical hands-on exercises. Resources such as eLearning, videos, and webinars are also available to enhance learning.
Software and database installation (10091331)
This document outlines the installation process for software and a pre-configured database following an order confirmation. It emphasizes the importance of ensuring that the IT environment meets necessary hardware and software specifications, as well as the role of a Consultant in reviewing infrastructure and advising on deployment options. Key areas covered include SQL revisions, resource allocation for installations, workstation deployment methods, and scheduling installation access rights. Users are encouraged to review a hardware system requirements guide prior to installation discussions.